OEE
71%
A 84% · P 91% · Q 93%
Production vs Plan
88%
18,420 / 21,000
Yield
92.8%
Scrap rate
5.2%
฿980,000
Rework rate
3.8%
฿1,240,000
Downtime (24h)
248 min
Cost / unit
฿42.7
Cost variance vs std
+4.8%
Downtime Pareto (24h)
Lines & work centers
Top AI exceptions
HighFactoryPulseTH-SRB · TH-SRB-L3
Line 3 OEE dropped to 62% (target 78%)
OEE
62% (-16pp)
Downtime
136 min
Work Center
WC-KIL-03
Suspected cause: Kiln temperature deviation during night shift, exceeding ±15°C tolerance.
Recommended action: Inspect kiln WC-KIL-03 thermocouple and schedule preventive maintenance.
Owner: Maintenance Manager (Saraburi)Estimated impact: ฿740,000
HighYieldGuardTH-SRB · TH-SRB-L3
Abnormal scrap on SKU 60x60 Glossy White (night shift)
Scrap rate
6.8% (vs 3.0% baseline)
Material lot
LOT-2026-0612-A
Defect
Surface crack
Suspected cause: Material lot variation combined with kiln instability on night shift.
Recommended action: Quarantine LOT-2026-0612-A, request supplier COA, run containment QC.
Owner: Quality Manager (Saraburi)Estimated impact: ฿560,000
MediumCostSenseTH-SRB
Saraburi cost/unit up 4.8% vs last month
Material
+2.1%
Rework
+1.4%
Yield loss
+0.9%
Suspected cause: Driven by Line 3 rework and yield loss on 60x60 SKU group.
Recommended action: Address kiln issue and material lot quality to recover ~2.3pp.
Owner: Plant Controller (Saraburi)Estimated impact: ฿1,240,000