AI daily summary Executive Copilot

Today focus on Saraburi Line 3 and Kiln Work Center. OEE is 16pp below target, downtime up by 136 min, and SKU 60x60 scrap rate is 1.8× baseline on night shift. Estimated margin impact: ฿1.3M this week if not addressed.

Group overview · 4 plants

OEE
74%
Target ≥ 78%
Production vs Plan
92%
64,420 / 70,000
Downtime (24h)
666 min
Across all plants
Scrap + Rework Cost
฿5.11M
This month

Plant performance ranking

#PlantOEEYieldScrap rateCost / unitCost variance vs std
01
🇻🇳 Binh Duong
VN-BD · Ceramic Tile
82%96.1%2.8%฿37.8-1.2%View plant
02
🇮🇩 Jakarta
ID-JKT · Sanitaryware
76%94.8%3.6%฿88.4+1.1%View plant
03
🇹🇭 Saraburi
TH-SRB · Ceramic Tile
71%92.8%5.2%฿42.7+4.8%View plant
04
🇵🇭 Manila
PH-MNL · Decor Surface
68%93.5%4.1%฿54.2+3.4%View plant

Top AI exceptions

View all
HighFactoryPulseTH-SRB · TH-SRB-L3

Line 3 OEE dropped to 62% (target 78%)

OEE
62% (-16pp)
Downtime
136 min
Work Center
WC-KIL-03
Suspected cause: Kiln temperature deviation during night shift, exceeding ±15°C tolerance.
Recommended action: Inspect kiln WC-KIL-03 thermocouple and schedule preventive maintenance.
Owner: Maintenance Manager (Saraburi)Estimated impact: ฿740,000
HighYieldGuardTH-SRB · TH-SRB-L3

Abnormal scrap on SKU 60x60 Glossy White (night shift)

Scrap rate
6.8% (vs 3.0% baseline)
Material lot
LOT-2026-0612-A
Defect
Surface crack
Suspected cause: Material lot variation combined with kiln instability on night shift.
Recommended action: Quarantine LOT-2026-0612-A, request supplier COA, run containment QC.
Owner: Quality Manager (Saraburi)Estimated impact: ฿560,000
MediumDowntimePredictPH-MNL · PH-MNL-L1

Press calibration drift — downtime risk in 48h

Risk score
0.78
MTBF
118h (vs 240h)
Last PM
42 days ago
Suspected cause: Calibration interval exceeded; vibration trending up.
Recommended action: Schedule preventive maintenance in next planned downtime window.
Owner: Maintenance Manager (Manila)Estimated impact: ฿210,000
MediumCostSenseTH-SRB

Saraburi cost/unit up 4.8% vs last month

Material
+2.1%
Rework
+1.4%
Yield loss
+0.9%
Suspected cause: Driven by Line 3 rework and yield loss on 60x60 SKU group.
Recommended action: Address kiln issue and material lot quality to recover ~2.3pp.
Owner: Plant Controller (Saraburi)Estimated impact: ฿1,240,000

Live agent activity

AI Agents
FactoryPulsePB-OEE-DROPCompleted
07:12

OEE drop on TH-SRB Line 3 attributed to kiln thermocouple drift.

YieldGuardPB-SCRAP-SPIKECompleted
06:45

Scrap spike on SKU 60x60 Glossy White isolated to one material lot.

DowntimePredictPB-DOWNTIME-PREDAwaiting approval
05:00

Predictive maintenance for PH-MNL Line 1 — awaiting plant approval.

CostSentinelPB-COST-VARCompleted
04:00

TH-SRB cost variance traced to Line 3 quality issues.